Laserfiche WebLink
08/24/99 <br />FIRST HALF 1999 SUBSIDENCE SURVEY REPORT <br />Survey Data <br />During the first half of 1999, subsidence survey data was collected periodically from <br />established monuments on Routt County Road No. 33, the Hayden-Gore Pass, Wolcott <br />Tap-Wolcott (PSC) and Western Area Power Administration power lines, two dwellings <br />and Middle Creek in areas underlain by gate roads or panel centers during periods of <br />mining in the 5 Right longwall panel. As is reflected in the data and on the attached <br />subsidence map, the 5 Right longwall panel did not directly undermine the railroad and <br />Foidel Creek during the first half of 1999. <br />The data and frequency for the survey monuments along Routt County Road No. 33 are <br />presented in the attached Table 1. <br />The data and frequency for the survey monuments along the Wolcott Tap-Wolcott (PSC), <br />Western Area Power Administration and Hayden-Gore Pass power aze presented in the <br />attached Tables 2, 3 and 4. <br />Middle Creek was surveyed in May 1999. A profile of the creek showing the subsidence <br />effects due to the mining of the 5 Right longwall panel is attached as part of this report. <br />II. Structures <br />Structures affected during the first half 1999 reporting period include the Wolcott Tap- <br />Wolcott (PSC), Western Area Power Administration and Hayden-Gore Pass power lines, <br />Routt County Road No. 33, two dwellings and a small section of Middle Creek. Foidel <br />Creek and the Union Pacific Railroad were not undermined during the first half of 1999. <br />Visual inspections of the Vl'olcott Tap-Wolcott (PSC), Western Area Power <br />Administration and Hayden-Gore Pass power lines were conducted concurrent with the <br />surveys of the power poles from January 4, 1999 through June 26, 1999. No significant <br />damage to the structures was noted during this period. No repair work was required as a <br />result of TCC's mining activity. <br />Visual inspections of Routt County Road No. 33 between monument 109 and 111 and the <br />adjacent power line were conducted from Mazch 16, 1999 through May 23, 1999, 1999. <br />Minor changes in the road shoulder of the eastern-most portion of this segment were first <br />detected on Mazch 25, ]999 approximately 500' southwest of survey monument no. 109. <br />No repair work was performed in this area. Additional minor changes in the road shoulder <br />of the eastern-most portion of this segment were detected on March 29, ] 999 <br />approximately 1000' southwest of survey monument no. 109. As noted on the Mazch <br />through May 1999 inspection forms, other cracks on the shoulder and roadbed were <br />991stHalfSubReport.doc Page 1 oft <br />