Laserfiche WebLink
<br />The general dip of the bedrock In the West Pk area la on the order of 3 to 5 <br />degrees to tho NNE. Localized undulations In the bedrock create localized varlatlon6 <br />In the dip angle and dlroctlon. There era several existing slides of various slzos In <br />the goners) vicinky. The unfavorable dip dlroctlon, presence of low irlctlon clayatone <br />layers, and seepage in combination can Create marginal to unstable condklone. At <br />this time evidence of algnMicant bedrock movement or (allure has not developed. <br />Alternatives to Improve condklone era Ilmked. Meaauros to Improve stabllRy <br />oondklons wero performed In the spoil fill area end are planned In the existing pond <br />a11de area. We do not believe a elide In the seepage area will effect the spoil fill and <br />removsl of the elide mane will control possible effects on sediment pond operatlona. <br />We antlclpate that excavation of the Wsat Pk will cut off a etgnlflcant recharge area <br />of the seeps. We do not believe eddklonal Irrveetigatlon or atablilzetion efforts are <br />required et this time. <br />We recommend the following drainage Improvements for the seepage areas. <br />The topsoil In the seep areas should be removed to expose the seep. A gravel dram <br />(2 Inch, clean rock) should bs Inetellod end provided wkh a gravky outlet. A <br />conceptual detail of the proposed drain la shown on FIg. 2. The drsln can be <br />installed at each slgniflcsnt asap location. <br />We do not believe monkoring of the seep areas to detect movement Is <br />merk^d. If elgntficant movement of bedrock occurs we believe k will be readily <br />apparent. <br />Sooll FIII Stebllkv <br />During stripping operations and drain construction for the excess spoil fill, <br />seep areas were tdentlfled near the face of the flII and wero provided wkh drains end <br />lateral connectlona to the main underdraln (Observations of Stripping Operations, <br />Job No. 21,952; letter dated July 30, 1994). An observation well will be Installed on <br />the first bench of the till end survey monuments Installed. Quarterly monkoring of <br />these festurea is recommended. <br />Baasd on our field observations, ws believe the construction of the excess <br />spoil fill has been In conformenn wkh the design racommendatlona presented In our <br />Oeoteehntcal Inveatlgatlon, Weat Pk l.xcese Spoil Disposal Ska (Job No. 18,516, <br />report dated March 1,1991). Seepsge areas evident during stripping wars provided <br />wkh drams and the main underdraln exceeds the length recommsndatlona In our <br />previous report. At this time ws have not observed condklone which we bellove <br />compromise the stability of the fill. We believe the proposed monkoring program la <br />adequate to detect water buildup near the face which could aNect stability, <br />GOL0Wri1 GOAL COMPANY L P. <br />cTLrc a~oo~ 3 <br />9 lt:B5444SBE0E «NOSdWOHl/l10 WdBS:L SB-9 -L NOSdWOHl/110: A9 1N3S <br />