Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, 1NC. <br />Project: Refuse Pife <br />Location: Foidel Creek Mine <br />Client: Twentymile Coal Co. <br />Project No.: 99-3983 <br />Report No.: 33 <br />Date: Bl18l07 <br />Time: 3.5 <br />Mileage: 50 <br />Engr./Tech: CR <br />Work Performed: <br />As requested, we visited the project site on this date and conducted compaction test No.'s 358 and 359 on the <br />material that was placed in the refuse pile. <br />Twentymile Coal Company had previously placed and compacted processed Waste Coal in Area 3 at the refuse <br />pile. . <br />We obtained a moisture content sample at each test location as well as a composite sample from the test sites. <br />These were delivered it to our_ laboratory for checkpoint Proctor determination. The checkpoint matched <br />previously completed Proctor No. 7. <br />Remarks: <br />The material tested generally met the project specifications for compaction. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Dave Wallace of Twentymile Coal Co. was notified of today's test results. <br />