Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Refuse Pile <br />Location: Foidel Creek Mine <br />Client: Twentymile Coal Co. <br />Project No.: 993983 <br />Report No.: 32 <br />Date: 8/14/07 <br />Time: 3.5 <br />Mileage: 50 <br />Engr.l7ech: CR <br />Work Pertormed: <br />As requested, we visited the project site on this date and conducted compaction test No.'s 354 through 357 on the <br />material that was placed in the refuse pile. <br />Twentymile Coal Company had previously placed and compacted processed Waste Coal in Area 2 and Area 2 %: <br />at the refuse pile. <br />We obtained a moisture content sample at each test location. In addition, we obtained a composite sample from <br />the test sites and delivered it to our laboratory for checkpoint Proctor determination. The checkpoint matched <br />previously completed Proctor No. 7. <br />Remarks: <br />The material tested genera{{y met the project specifications for compaction. <br />Please refer to the attached sheet for results of toda~s testing. <br />Verbal Discussions: <br />Dave Wallace of Twentymile Coal Co. was notified of today's test results. <br />