My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17183
DRMS
>
Back File Migration
>
Report
>
REP17183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:16 PM
Creation date
11/27/2007 2:04:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Report
Doc Date
10/29/1980
Doc Name
CERTIFIED CONSTRUCTION REPORT FOR EXCESS SPOIL FN 2A
From
ENERGY FUELS CORP
To
MLRD
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~r~l • <br />energy fuels corporation <br />box g .steamboat springs, Colorado 80477 • (303) 8733900 <br />r. David C. Shelton <br />Director <br />Colorado Mined Land <br />Reclamation Division <br />1313 Sherman Street <br />Denver, CO 80203 <br />t <br />_l~~ ,~ <br />~~ ~ <br />October 27, 1980 <br />- _ ~ r - 1. <br />oc! 2 ~ ~sao <br />Colo. Deny... ~'o+.~~.z! ..__~_ ,~s <br />III IIIII IIIIIIIIIII <br /> <br />Mr. Donald A. Crane <br />Regional Director <br />Office of Surface Mining <br />Brooks Towers <br />1020 15th Street <br />Denver, CO 80202 <br />RE: Certified Construction Report for Excess Spoil Pile No. 2A <br />Gentlemen: <br />A representative of CTL/Thompson, Inc., Consulting Geotechnical and <br />Materials Engineers, has been on site throughout the critical stages of <br />construction of Excess Spoil Pile No. 2A. You will recall that CTL/ <br />Thompson, Inc. was the firm that performed all stability analyses and <br />designed and planned the excess spoil piles at Energy Mine No. 1, so they <br />are intimately familiar with the construction standards to be used. <br />For your records there is enclosed with this letter a copy of CTL/ <br />Thompson's construction observations, a copy of their photos taken during <br />construction and a copy of their daily field reports. <br />As Energy Fuels begins construction of Excess Spoil Pile No. 1, a <br />representative from CTL/Thompson, Inc. will again be on site to oversee <br />design implementation, run compaction tests on the fill and certify com- <br />pletion of the stages of construction. Their reports will similarly be <br />forwarded to you for your records. <br />Should you require additional information, please do not hesitate to <br />contact us. <br />Sincerely, <br />ENERGY FUELS CORPORATION <br />~1 ~~. <br />J~. Griffin <br />Senior Engineer - Mine Planning <br />JMG/lar <br />
The URL can be used to link to this page
Your browser does not support the video tag.