Laserfiche WebLink
~ '' III IIIIIIIII IIII III <br />999 <br />BATTLE MOUNTAIN GOLD COMPANY <br />February 4, 1997 ~ -~ ~'.~'r~ <br />Mr. Jim Dillie ttti 101991 <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 "'°`""'..,,~~la,~u~„~Io9Y <br />Subject: Battle Mountain Resources, Inc. -San Luis Project <br />DMG Permit No. M-88-1 12 <br />Monthly Pond Compliance Report -January 1997 <br />BATTLE MOUNTAIN <br />GOLD COMPANY <br />Dear Mr. Dillie: ~~`,_ <br />Attached is the January 1997 monthly summary of cyanide analysis performed on samples <br />from the tailings pond and the collection pond as required. TR-O10 specifies a simple <br />monthly average for regulating pond compliance. The January averages are as follows: <br />Tailings Pond 0.50 ppm CN-wad, 0.59 ppm CN-total <br />Collection Pond 0.25 ppm CN-wad, 0.38 ppm CN-total <br />The January simple averages show compliance with our permit standards of 3.8 ppm CN- <br />wad and 4.4 ppm CN-total. Samples collected on January 13 and 28 were sent to <br />Sangre de Cristo Laboratories for outside lab verification. <br />Sincerely, <br />Richard Neu <br />Metallurgical Engineer <br />Enclosures <br />cc: Anne Baldrige <br />Dan Robertson <br />P.O. BOX 310 SAN LUIS, COLORADO 81 I S? <br />(719)672-3362 FA\(719)67?-)163 <br />