My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17022
DRMS
>
Back File Migration
>
Report
>
REP17022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:09 PM
Creation date
11/27/2007 2:01:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Report
Doc Date
5/23/1994
Doc Name
INSPECTION REPORT EMBANKMENT OF HIGHWALL AREA
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiiiiiiiii <br />~_ <br />~ BACICH ENGINEERING <br />(, <br />CONSTRUCTION <br />~. x. anacr r E. SURVEYING & INSPECTION <br />801 CHESTNUT ST. rnonelsosleae-enl <br />~icQ.H3ldX RStt <br />TRINIDAD, COLORADO 81082 <br />INSPECTION REPORT <br />EMBANKMENT OF HIGHWALL AREA <br />DATE OF INSPECTION: May 20, 1994 <br />IDENTIFICATION: Removal of the Primary Waste Disposal & Embankment of the <br />Highwall Area. <br />LOCATION: Sec. 36, T33s, R64W, 6th P.M. <br />Las Animas County, Colorado <br />COMMENTS: This inspection was made as per 4.09.1(11)(1)(4) of the General <br />Requirements. The embankment material was hauled from the waste area to <br />the highwall fill area and placed to required grade. This operation was <br />completed as required. Inspected to the completed grade and proper slope <br />prior to the beginning of the placement of the cap material. Cap material <br />obtained within site area having more suitable soils for vegetation growth. <br />The placement of materialin embankment areais as per specification. Comp- <br />action testing, as previously witnessed, by Lincoln De Vore Inc. shows <br />tests no.1 thru 19 all within the required 90~ compaction specification. <br />Method of placement is same as previously reported and continues as per <br />specification. <br />Drainage of the highwall embankment area is controlled by meeting the <br />grade of the undisturbed contour drainage above. The shaping and the <br />reclamation of the waste area will be worked on later and reported as <br />such, <br />PROFESSIONAL ENGINEERS STATEMENT: I John <br />report was prepared and presented hereon <br />best of my knowledge and information. <br />May23,1994 <br />Date <br />H. Bacich state that this <br />is t <br />ue an t to the <br />d correc <br />r / <br />Joh H. Bacich .E. #9869 <br /> <br />~pputluunnrru~i <br />L <br />,~~ iii ~lllll I~ll~~~`"` <br />-. .. I ... . i ..d+13 ~r":... <br />
The URL can be used to link to this page
Your browser does not support the video tag.