Laserfiche WebLink
New Elk Mine <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: NEW ELK <br />Waste Bank MSHA ID. No.: Development Waste Disposal Area <br />Inspection Period: Second Quarter 2007 <br />Inspection Date: 7/4/2007 <br />General Description or Reference to Site Plan: <br />The Deve{opment Waste Disposal Area is located south of State Highway 12 and west of <br />the main facility Access Road. It is adjacent to and north of the Middle Fork of the <br />Purgatoire River. The area has been used for disposal of waste rock from the underground <br />mine. Since mine closure in 1989, the area has been used for disposal of sediment removed <br />from ponds and ditches located within the mine permit area. <br />Activity During Inspection: <br />Transport of waste to the area has been completed and the operator is in the process of <br />compacting and grading the final lifts to the design slope of no greater than 2h:1v. Upon <br />completion a demonstration of compaction will be completed prior to soil cover placement. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction andlor <br />discharge, integrity of 100-year 24-hour drainage structures, and evidence of positive drainage). <br />Positive drainage is maintained on the surface of the DWP. No evidence of springs nor seeps <br />was observed. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />Waste has been trucked to the area and spread and compacted into 2 foot lifts using a D-8 dozer. <br />Page 1 of 2 <br />