Laserfiche WebLink
._-~ <br />Jaunary 8, 1988 <br />David C. Shelton <br />Mined Land Reclamation Division <br />1313 Sherman St., Room 723 <br />Denver, CO 80202 <br />RE: Annual Report MLR File No. 77-560 <br />Valco, Inc. <br />Rocky Ford East Pit <br />Otero County <br />Dear Mr. Shelton <br />VALCO, INC. <br />ROCKY FORD CONCRETE DIVISION <br />P. 0. BOX 550 <br />ROCKY FORD. COLORADO 81067 <br />(303) 254-7461 <br />Mining and reclamation is running fairly close to our time table .~t this <br />time. <br />Reference is made to MLRB rules and regulations, effective July 1378, see <br />2-40, 2-41. <br />(1) There was approximately 1 acre disturbed in 1987. <br />(2) We moved overburden in about 1 acre. The overburden <br />was dumped on the East side of the pond and on the <br />South peninsula. <br />(3) We have backfilled all around the pit. We have <br />sloped as much as has been permissible. we have <br />started work on South peninsula. <br />(4) Not applicable <br />(5) Not applicable <br />(6) Reclamation efforts have been successful, all of <br />the Piorth area has been sloped up to the area where <br />the peninsula starts. <br />(7) We expect to affect at least 2 acres of gravel in <br />1988. <br />(8) The effective date of this infozmlation herein is <br />January 8, 1988. <br />Sincerely <br />LarLy Pieper <br />General Manager <br />LP~sW LAMAR CANON CITY PUEBLO GUNNISON <br />r III IIIIIIIIIIIIIIII <br />r 999 <br />Enclosures <br />