Laserfiche WebLink
<br />Henderson Mine, Permit #M-77-342 <br />Site Specific Reclamation Costs <br />Page 5 <br />12. Contractor-s camp and storage (9 acres) <br />a) Fertilize (9 acres at $180/acre) $ 2 <br />Total... $ 2 <br />13. Borrow area (4 acres) <br />a) Revegetate (3 acres at $1,900/acre). $ 6 <br />b) Fertilize shores (1 acre at $180/acre). $ 0 <br />Total... $ 6 <br />14. Power line/Refi~se Area (17 acres) <br />a) Dismantle. $ 0 <br />b) Grading and site preparation. $ 12 <br />c) Revegetate road bed (3 acres at $1,900/acre). $ 6 <br />d) Fertilize slopes (14 acres at $180/acre) $ 3 <br />Total... $ 21 <br />15. Makeup water line/Pump house (8 acres) <br />a) Dismantle. $ 0 <br />b) Grading and site preparation. $ 2 <br />c) Revegetate pump house (1 acre at $1,900/acre). $ 2 <br />d) Fertilize (7 acres at $180/acre) $ 1 <br />Total... $ 5 <br />16. Tailing line/Power line (47 acres) <br />a) Dismantle. $ 0 <br />b) Grading and site preparation. $ 8 <br />c) Revegetate (5 acres at $1,900/acre). $ 10 <br />d) Fertilize slopes (27 acres at $180/acre, I application) $ 5 <br />e) Buffer, 3 acres $ 0 <br /> Total.. . $ 23 <br />17. East Branch flood bypass (5 acres) <br />a) Fertilize (5 acres at $180/acre) $ 1 <br /> Total.. . $ 1 <br />