My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP16831
DRMS
>
Back File Migration
>
Report
>
REP16831
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:01 PM
Creation date
11/27/2007 1:59:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
10/25/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC SAN LUIS DMG PN M-88-112 TAILINGS AREA CONSTRUCTION ACTIVITIES WEEK OF
From
BATTLE MOUNTAIN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• iii iiiiiiiiiiiiiiii • <br />BATTLE MOUNTAIN RESOURCES, INC <br />A r[•.-z s~fo... <br />~P-~.~..-r~ G G <br />October 25, 1993 <br />Mr. Larry Oehler <br />Division of Minerals and Geology / ~;.'4' <br />1313 Sherman Street, Room 215 ~~ <br /> <br />Denver, Colorado 80203 _,~ <br />iiLE MOUNWN <br /> D COMPANY <br />Re: Battle Mountain Resources, Inc. (BMRI) - San Luis <br />DMG Permit No. M-88-112 <br />Tailings Area Construction Activities <br />Week of October 25, 1993 <br />Dear Mr. Oehler: <br />During the week of October 18, 1993, construction activities <br />were limited to final shaping of the East dike, rough <br />spreading of liner base material on the east slope, <br />placement of approximately 2 acres of liner cover material <br />on the North dike, and stockpiling of liner cover material <br />in the borrow pit. Since BMRI has voluntarily suspended <br />construction activities on the embankment lift, the <br />stockpiled embankment fill material was used to upgrade and <br />provide an MSHA berm adequate for haul trucks on the 620' <br />crest road along the south side of the facility; this <br />activity was simply re-arranging the construction <br />sequencing. <br />The liner contractor was off-site; Serrot did not return to <br />the site as earlier expected due to lack of availability of <br />liner material. BMRI has submitted a request to the <br />Division to upgrade the liner material from 40 mil VLDPE to <br />50-60 mil VLDPE and awaits the Division response to continue <br />liner installation. Both the Division and BMRI continue <br />work towards bringing on-line a third party construction <br />monitor. <br />The following is a summary of construction activities for <br />the week of October 25, 1993: <br />-Complete the final shaping and liner <br />placement for the East dike area. <br />-Continue stockpiling and placement of <br />on the north side of the facility. <br />-Pending weather conditions and liner <br />the liner contractor will tentatively <br />October 26. <br />base material <br />liner cover material <br />material availability, <br />resume activities on <br />A SU/151I>IARY Oh U.ATTLF M!J(INfAIN GOLD COMPANY <br />P.O. ROX 310 SAN LUIS. COLORADO N1152~0310 1719) 67dd362 FAX 1719) 6723363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.