Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, Colorado 802U3 <br />Phone: 1303) 866-35fi7 <br />FA%: (303) A3b8106 <br />October 24, 1996 <br />Mr. Thomas C. Anderson <br />Oxbow Carbon & Minerals <br />P. O. Box 535 <br />Somerset, CO 81434 <br />Re: 1995 Annual Hydrologic Monitoring Report; Sanborn Creek Mine; <br />Permit No. C-81-022 <br />Dear Mr. Anderson: <br />I~~~~ <br />DEPARTMEtJ'T OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames S. Lochhead <br />Executive Director <br />h1¢hael B. long <br />On~s~on Director <br />The Division has reviewed the 1995 Annual Hydrology Report (AHR) for the Sanborn <br />Creek Mine. This letter presents the Division's comments and recommendations regarding <br />the 1995 AHR. <br />The operator did a good job in collecting and reporting the required water monitoring data <br />in accordance with the approved plan. Only minor deviations from the approved water <br />monitoring plan are noted for the frequency of data collection. It is noted that groundwater <br />monitoring well WSC DH12 could not be sampled at the required time in June, 1995 <br />because the well was dry. Springs SP-1 thrdugh SP-6 were not sampled in April, 1995, and <br />springs SP-4 and SP-5 were not monitored in May, 1995. Samples could not be obtained <br />from these springs due to poor ground conditions rendering the springs inaccessible. <br />Colorado Discharge Permit System (CDPS) limitations were met for all discharges from the <br />Sanborn Creek Mine. Outfall 011 was the only discharge point that had a discharge from <br />the mine during 1995. <br />The Division has the following specific comments on the 1995 AHR. <br />1. Please provide a Table of Contents to the front of the report identifying the <br />Appendices and Maps contained in the report. <br />2. It would be very helpful to have well completion information provided in the report. <br />If available, please provide well construction details in a report table added to the <br />AHR. <br />