Laserfiche WebLink
• • <br />ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-32-I If (3), and C.R.S. 34-32.5-I 16(3)(x), on the anniversary date of the permit each year, <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land, <br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.) <br />If your operation is subject to dre provisions oFTemporary Cessation as defined in the Act and Rules, you must <br />provide with [he Annual Repot: the following information as required by 2 CCR 407-I, 407-4, and Rules <br />1.13.7(I)(a): <br />(i) the condition of thc: operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance <br />standazds and Environmental Protection Plan requirements, if they are part of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Repor, as apphcable: <br />(a) Per the requirements of 2 CCR 407-1, 407-0, and Rules I.IS(I), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCR 407-1, 407, and Rules 1.15(1)(a), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Tmst, and security agreements, self-insurance, salvage <br />credit, and firs[ priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent apxaiser, indicating any changes in property value, and a statement summarizing <br />any circumstan~:es which may affect the adequacy of the Deed of Trust, or Security agreement, <br />and the value o: the property subject to either of these instruments. -fhe report shall also provide <br />proof that there are no past-due property taxes. <br />(i) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Len.er of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does not exceed ten percent (10%) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Pnority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully d~:scribe the condition, value, and location of all pledged fixtures and eyutpment. <br />(h) Per the requirement o(2 CCR 407-I. 407-4, and Rules I.I~t I)(c), all monitoring information <br />reyurred as part of the approved permit application. to include the Environmental Protection Plan. (Please <br />nuts that tf you are not .~ Designated Mining Operation. }•ou wdi not have an Environmental Protection <br />Pl.in a~ p;,n of your approved permit.) <br />