Laserfiche WebLink
isturbance that is not contained within the pit is contained with silt fence and berms. <br />(2) No reclamation could be done in the past year since mining has just been completed <br />in Phase 1 (East Area). Now that the east area is completely mined, topsoil will be <br />stripped from the west area and replaced on the reclaimed east area slopes. Mining will <br />then resume on the west area. <br />(3) For the upcoming year, the portable crushing and screening facilities will return and <br />mining will continue west of the unnamed drainage. It is estimated that only 2-3 acres <br />will be disturbed in the upcoming year in the western portion of the mining area. <br />(4) Reclamation over the upcoming year will consist of backfilling and grading the <br />slopes of the east mining area, followed by topsoiling of these areas. The topsoil will <br />be obtained from new mining in the west area. <br />(5) The current contact for this operation is: <br />Jason Burkey <br />B&B Excavating, Inc. <br />PO Box 1729 <br />Edwards, Colorado 81632 <br />Phone # (970) 926-3311 <br />Tax I.D. <br />Enclosed is a check for $688.00 for the annual fee. <br />Sincerely, <br />C~ ~~~~ <br />Greg Lewicki, P. E. <br />Greg Lewicki and Associates <br />cc: Jason Burkey <br />