My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP16478
DRMS
>
Back File Migration
>
Report
>
REP16478
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:45:46 PM
Creation date
11/27/2007 1:53:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Report
Doc Date
11/4/2005
Doc Name
3rd Quarter 2005 Inspection of Excess Spill Fill Reports
From
Peak Project Management, LLC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ,~ <br />Spoil Fill #9 <br />September 27, 2005 <br />Page 2 <br />FH.L PLACEMENT <br />CDMG regulations requne that spoil be "placed in horizontal Iifts in a controlled mamrer, concurrently <br />compacted as necessary to ensure mass stability". Maximum lift thiclmesses are not specified. As indipted <br />by previous inspection reports, lifts were placed in accordance with plans specified by the CTL Thompson <br />report. Spoi] material was transported to the fill area using a combination of trucks and dozers. Lift <br />tbicknesses of up to 50 feet were placed within the area removed from the Sll face by more than 50 feet. <br />Fill placement terminated by second quarter 2002. <br />No fill placement occurred during this quarter, nor is future placement a~cipated. <br />COVER MATERIAL <br />As documented by previous inspection reports, cover placement, seeding and mulching was completed <br />during the second quarter 2002 and upper areas during the second quarter of 2004. <br />During the second quarter of 2005, areas disturbed by maintenance of the armored down-drains were band <br />seeded using terrified weed free straw and the approved rangeland seed mix. <br />STRUCURALINTEGRITY <br />The entire excess spoil fill facility was examined for signs of failrue and instability suds as tension cracks, <br />ground movement, springs and seeps, and standing water. No indication ofpotential instability was <br />observed. <br />DOCUMENTATION AND OTHER OBSERVATIONS <br />No significant erosion was noted wilt established drainages functioning as desigped. <br />CERTIFICATION <br />This inspection was conducted by Ronald G. Thompson, a qualified professional and MSI-IA certified <br />inspector of earth and rock-fill embanl®wts and inrpoundments, under the direction of Mr. Charles <br />McGlothlin, a registered professioml engineer licensed in the State of Colorado. <br />This is to certify, to the best of my knowledge and belief; that Fill No. 9 construction and placement, as <br />noted since the previous certification and as determined during this inspection and discussions with mine <br />personnel, is in accordance wilt designs as proposed by CTZ Thompson in their report dated AprD 27 and <br />amended July 27, 2001 and as approved by the Division of Minerals and Geology. <br />4 -~r- <br />Ronald G. Thompson Charles W. eGlothtin " ~ ~"~', ~~kcGt ! <br />Inspector Professional Engineer - _.. <br />~ae~: <br />• ~ ~~= . <br />b~cSCU~ /~' <br />
The URL can be used to link to this page
Your browser does not support the video tag.