My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP16390
DRMS
>
Back File Migration
>
Report
>
REP16390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:45:42 PM
Creation date
11/27/2007 1:51:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
2/26/1986
Doc Name
1985 ANNUAL REPORT HENDERSON MINING PN 77-342
From
CLIMAX MOLYBDENUM CO
To
MLRB
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br /> <br />Area 4 <br />Repair and maintenance of the grade along the railroad right-of-way <br />necessitated some reseeding. <br />Area 9 <br />A new haul road to the north soil stockpile was constructed with <br />subsequent roadside revegetation accomplished. <br />Tailing deposition and water acreage totaling 636 acres at the end of <br />1985 were well below the 715 acres which were forecasted for the 1985-86 <br />surety period due in part to the two-month shutdown. <br />Area 13 <br />A fill area on the county road near Area 13 failed during above-average <br />1984 spring runoff. The problem necessitated reopening the borrow area to <br />supply the county with material for road repair. Work on the road and <br />surface dressing of the borrow area was completed in November 1984, and the <br />area was seeded in 1985. <br />Area 21 <br />A new haul road to the north soil stockpile was constructed. A good <br />portion of the time for the summer soil salvage-stockpile program was lost <br />due to a July and August operational shutdown, although 6,850 cubic yards <br />of soil were stockpiled. <br />Area 23 <br />Revegetative stabilization by grass seeding was begun in the fall on <br />some unused construction roads and associated slopes. <br />ENVIRONMENTAL PROGRAMS <br />Monitoring of various environmental programs which may have a bearing on <br />the Reclamation Plan continues to receive attention. Highlights of selected <br />programs for 1985 are as follows: <br />Soil-Tailing Test Plot <br />As previously mentioned during a 1985 MLRD inspection, we sampled the <br />soil and vegetation in the test plot this summer. We will provide data and <br />reports to you as they become available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.