My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP16363
DRMS
>
Back File Migration
>
Report
>
REP16363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:45:41 PM
Creation date
11/27/2007 1:51:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989077
IBM Index Class Name
Report
Doc Date
8/27/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110 1 CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'k# ~, zol~ <br />---- <br />~ ~ 75 d3 <br />~~~ ~~~I~~~~~~~~~ ~~~ <br />Notice of Intent _..999.ue mining Operations RECEIVED <br />110(1) Construction Materials Annual Report <br />Permittee Name: Colorado Alabaster Supply AUG 2~7 1997 <br />Permit No. M-89-077 <br />Operation Name: Colo Alabaster <br />Anniversary Date: August 28, 1997 pp <br />Total: $75.00 (Due on your Anniversary Date)~~i0ian of MinOr819d GB01pgy <br />1. a. Permitted acreage: ~,Q`1 b. County where mine is located: LF~R-IMERr <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? MORE ESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* NO L~IiAnF,E <br />5. Total acres reclaimed for the report year:* NO C NA('16E <br />6. Total number of acres in topsoil replacement stage: ~n e~JQNb~ <br />a. Average thickness of topsoil replaced: ~/~ Cl~FL4NGE <br />7. Total number of acres seeded: N A CF~AhIC~rE <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* I~JA Ci1aNGr~ <br />10. Estimated total acres to be affected in the next report year:* }~n (~l~lll(Vf9F <br />11. CONA7ENTS: <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature :,.~:~~~~///~ Date: g-ZS -q ~] <br />Please type or print current contact name, mailing address, and phone number below: <br />contact Name: STFtNLbY ~. ~01~1E'J Phone: (q70) ZZI-0723 <br />//''~~ ^ C.. FAX No: (q'ID) ZZI-~7Z3 <br />Company: L.U~{~~D,4LL48ASTE~P_S1PP~y <br />Address: I5~7 ~D{ZTa-~ ~~y ~ «.c ~V~N~,~E <br />-~ i~r Gow r15 ~ ~ L [~Q,41~0 8o5Z~ <br />Federal Tax ID No. or Social Security No.: ~Z~- ~'I~ - q D 4~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.