My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-05_REPORT - M2005021
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2005021
>
2007-02-05_REPORT - M2005021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:34:46 AM
Creation date
11/27/2007 1:51:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005021
IBM Index Class Name
Report
Doc Date
2/5/2007
Doc Name
Annual Fee/Report/Map
From
Oldcastle SW Group, Inc. dba United Companies of Mesa County
To
DRMS
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. <br />ANNUAL REPORT <br />(~~P*~"n~ /""~l <br />Operator: United Companies of Mesa County YY~~ <br />FE9 0 5 2001 <br />Division of Reclamation, <br />Location: Anderson Pit Mining and Safety <br />File Number: M-2005-021 <br />Anniversary Date: February 1, 2007 <br />This location was active during this report period. United worked on several items prior <br />to our crusher making its first and only appearance for the year to crush approx. 50,000 <br />tons of redi-mix aggregates. We put in a painted left turn lane on eastbound Colo. Hwy. <br />92 at the intersection of Hwy. 92 and Delta County 1800 Road, replaced part of a "v" <br />ditch irrigation system with concrete pipe, constructed a haul road from Delta County <br />1800 Road to the southeast corner of the pit, constructed a haul road across the pit to the <br />first phase mining area, and stripped a portion of phase one mining area. <br />Other work in progress includes installation of water, gas, and electric lines to the <br />property and construction of a new redi-mix concrete plant to be located in the southeast <br />corner of the 160 acre property. This plant maybe completed by March of 2007. <br />Weed control was not satisfactory. This spring we will burn last seasons crop. We have <br />an agreement with a local rancher to plant alfalfa on approx. 105 of the 160 acre property. <br />This will keep the weeds down, continue the use of the irrigation water, and continue the <br />agricultural use of most of the land until it's needed for gravel mining. Better weed <br />management is planned on the remainder of the property this year as well. <br />The existing United grave] operation in Delta is nearly depleted. The Anderson pit will <br />eventually replace our existing location adjacent to the Delta Drive In. <br />Sincerely, <br />~ w,~~ <br />Brent W. Kerr <br />Resource Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.