Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of NaLLiral Rewwu•~ <br />111 J Shuman 81 , Ruom 21 S <br />Denver, Coloradu RO'O7 <br />Phone: 11071 BRR~ 15L7 <br />FAX 00118)?-8106 <br />May 6, 1994 <br />Gary W. Wendt <br />Manager, Environmental Affairs <br />Peabody Western Coal Company <br />1300 South Yale Street <br />Flagstaff, Arizona 86001 <br />RE: Seneca II Mine (C-80-005) <br />1993 Annual Reclamation Report <br />Dear Mr. Wendt: <br />~~ <br />I~EPAILTMENT C)I- <br />NATURAL <br />RESOURCES <br />h,•, h,.,,~~, <br />Arn 1..Lv.u <br />My har R L~np <br />uin.~~~n Ilan i, ~, <br />We have completed a preliminary review of the above mentioned report, and have identified <br />two minor concerns. Our concerns do not require revision of the text, but we believe PWCC <br />should be aware of them. <br />PWCC, on page 13 of the report, recommends that sediment surveys for ponds 004 and 008 be <br />delayed until 1996. While a delay may be appropriate, we would prefer that PWCC wait until <br />closer to the 1995 survey due date to make that recommendation. The decision to delay could <br />then be based on findings in quarterly inspections since the 1993 surveys. At that time, PWCC <br />could request a postponement of the surveys. <br />On page 14 of the report, PWCC states that construction certifications of stock ponds <br />completed during the 1994 season will be submitted with the 1994 Annual Reclamation Report. <br />In order to ensure compliance with Rules 4.05.9(2) and 4.05.6(10), the certifications should be <br />submitted immediately after construction is complete. <br />If you have any questions or need additional information, please contact me. <br />Sincerely, <br />i l <br />Susan L Burg ier <br />Environmental Protection Specialist <br />SLB\050694. W P <br />