Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 39 <br />Client: Bower Brothers Construction <br />Work Performed: <br />Date: 4/14/99 <br />Time: 3.5 <br />Mileage: 40 <br />EngrJTech: JK <br />As requested, we visited the project site on this date to conduct nuclear density test No.'s 155 through 165 on the <br />waste coal pile fill materials. Bower Brothers crews had placed and compacted processed waste coal material in <br />Area #1 of the pile and recompacted previously placed waste coal material in Area #2 of the pile in preparation for <br />placement of material stockpiled during the recent winter months. We obtained moisture samples from each test <br />location and material for checkpoint Proctor determination. The checkpoint matched Proctor curve No. 3 from this <br />project. <br />Remarks: <br />The material tested generally met with project specifications. <br />Please refer to the attached sheet for results of today's tests. <br />Verbal Dlseussions: <br />Carl and Mike of Bower Brothers Construction were informed of today's test results. <br />