Laserfiche WebLink
:. <br /> <br />BATTLE MOUNTAIN RESOURCES, INC. <br />August 9, 2004 <br />Mr. Jim Dillie <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />~1~'~'', <br />AUG 12 2004 <br />Division of Minerals & Geology <br />Re: Battle Mountain Resowces Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />July 2004 Monthly Report <br />Dear Mr. Dillie: <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMR[), San Luis Project for the month of July 2004. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Asswance and Quality Control <br />(QA/QC) Plan. <br />Vacuum on the tailing (ysimeters was verified on July 30`h, no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embanlanent piezometers on <br />July 30m, aril the West Pit and tailings embankment monitoring wells on July 28d'. The July 30th <br />tailing impoundment piezometer measurements identified these installations were either dry or <br />contained less than 12 inches of water as illustrated in Table 2. Tables 1 and 2 below identify the <br />depth to water measurements collected for each of the site monitoring wells, piezometers and <br />lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on July <br />27d'. The July tailings pond underdrain flow average was 41.42 gpm and a total of 510 gallons <br />of water was excavated from the leak detection system yielding a monthly average of 15.10 gpad. <br />During July, the West Pit water treatment plant (WTP) operated efficiently discharging a total of <br />8,745,700 gallons (26.84 acre-feet) of water to Rito Seco Creek and a total of 1,008,100 gallons <br />(3.09 acre-feet) of water was transferred from the WTP to the tailings impoundment. <br />Seepage along Rito Seco Creek remained dry during the month. The monthly precipitation <br />accumulation for July was 1.56 inches, with the largest accumulation occurring on <br />July 23rd (.27"). <br />EO. Box 310 • San Luis, Colorado 81152-0310 • (719) 379-0798 • Fax (719) 379-07]3 <br />