My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP16006
DRMS
>
Back File Migration
>
Report
>
REP16006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:45:26 PM
Creation date
11/27/2007 1:45:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
2/11/2000
Doc Name
BATTLE MOUNTAIN RESOURCES INC PN M-88-112 MONTHLY SAMPLING
From
BATTLE MOUNTAIN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiiiiii <br />BATTLE MOUNTAIN RESOURCES, INC. <br />RECEIVEC <br />February 07, 2000 <br />FEB 11 2000 <br />Mr. Jim Dillie <br />Division of Minerals and Geology r;lnslonof MitlBrdb& Geolo9Y <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: Battle Mountain Resources, Inc. DMG Permit No. M-88-112 <br />Monthly Sampling <br />Dear Mr. Dillie: <br />All required sampling was completed during the month of January. Analysis that have not been <br />received will be forwarded to you as I receive them. <br />The NANOIRO water treatment plant operated intermittently during the month. A total of <br />16,944,300 gallons of water was treated and discharged into Rito Seco during the month of <br />January. <br />Work continued on the stormwater diversion on Woste Rock "C" and the project is approximately <br />80% complete. <br />All surface water stations were inspected and RS-4 and RS-6 were found to be dry. <br />Vacuum on the lysimeters was verified and no water was present to sample. <br />When we checked the piezometers on the main embankment of the tailings impoundment on <br />1 /26/00, the piezometers were dry or contained below 12 inches of water. <br />The two west pit piezometers were measured for depth to water on 1 /26/00, with the following <br />result: BF-1 was 21.04 ft and BF-2 was 24.65 ft. The other piezometers in the West Mine area were also <br />checked with the following result: PW-1 was 23.11 ft, PW-2 was 23.23 ft, PW-3 vas 30.71 ft and PW-4 <br />was 29.20 ft. <br />The underdrain was measured at approximately 29 gpm. <br />The collection pond's leak detection system was frozen and we were unable to sample. <br />A SUBSIDIARY OF BATTLE MOUNTAIN GOLD COMPANY <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 672-4122 Fax (719) 672-3361 <br />
The URL can be used to link to this page
Your browser does not support the video tag.