Laserfiche WebLink
<br />RECLAMATION <br />During the period of report none of the areas within the <br />Sand Pit permit boundaries had beer. reclaimed. As it stands <br />today, mining operations in the Sand Pit area are such that <br />reclamation is unfeasible at this time. Sand is still being <br />extracted from some of those areas ready for Phase 1 of the <br />reclamation program. The reclamation timetables indicate <br />only back filling and the preparation of the slopes during <br />this time period. Slopes at the northeasterly corner have <br />been yraded in accordance with Phase 1 of the reclamation <br />program. 'Chis includes approximately 2 acres of land. <br />AFFECTED ACRES <br />The affected areas during the coming year will include a <br />portion of that 14 acres affected during this report period. <br />In addition, sand will be extracted from approximately 2 <br />acres of land adjacent to the westerly edge of the disturbed <br />area as indicated on the Annval Report Map. <br />