My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15980
DRMS
>
Back File Migration
>
Report
>
REP15980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:45:25 PM
Creation date
11/27/2007 1:45:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980020
IBM Index Class Name
Report
Doc Date
7/31/1989
Doc Name
BRALEY SAND & GRAVEL CO M-80-020 BRALEY S&G PIT 1 7/15/89
From
DONALD E MARTURANO ATTORNEY AT LAW
To
MLRD
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • III IIIIII IIIIIII III <br />DONALD. E.:,,MARTURANO <br />e~~taane~v a~i ~au.~- <br />P.O. ROX 8148 <br />LITTLETON, COLORADO 80341-8128 <br />(30.9) ]83-0800 <br />RECEIVED <br />July 28, 1969 <br />J U L 3 11999 <br />MINED LAND <br />RECII~MATION DIVlS!ON <br />Mined Land Reclamation Division <br />Attention: Barbara Chiappone <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203-2273 <br />Re: Annual Permit Fee -- Braley Sand b Gravel Company <br />Permit No.: M-80-020 <br />Operation Name: Braley SEG Pit No 1 <br />Anniversary Date: 7/15/89 <br />Dear Ms. Chiappone: <br />As the attorney for the referenced permit operator, I write. You <br />may recall that I called and spoke with you on July 18, 1989, <br />having just received your June 26, 1989 letter concerning the <br />annual permit fee required, together with the annual report. I <br />noted that your letter referenced that it was resent 7/13/89; <br />hence, it was not until July 18, 1989, that the same was received <br />here. There was a change of address, which your records appar- <br />ently did not reflect when that fee and report letter was <br />initially sent. <br />Pursuant to our conversation, you agreed that the operator could <br />pay the fee by the end of the month, July 31, 1989, and provide <br />the report at some reasonable time thereafter. Rather than <br />reiterating the specific reasons for our inability to provide a <br />report with this payment, suffice it to say that the report, <br />hopefully, will be sent by the end of August, but, in no event, <br />no later than September 30, 1969. <br />Enclosed is the operator's check payable to the Mined Land <br />Reclamation Division in the amount of $350.00 and the attached <br />sheet provided with your annual report letter, which I have signed <br />for the operator and permittee and indicated our hope to have the <br />report sent by the- end ~of August, but, at the outside, our <br />deadline that the same will be prepared and sent by the end -` <br />September. <br />
The URL can be used to link to this page
Your browser does not support the video tag.