Laserfiche WebLink
`"". '~ .. <br /> <br />Mine;_~ <br />Dat®:^,~ <br />Waste Bank <br />QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br />Rules 4.09(71) and 4.10(2)(2) <br />0 . <br />General Description or Reference to Site Plan: <br />^ Golden Eagle -Exhibit 17, pages 2.05-t 9, 2.05-75 (a) through (cJ <br />G~Vew Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surface Drainage System <br />^ Placement of Underdrainis)' <br />^ Revegetation ^ Construction of Fill <br />Drainage; Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year 24-hourappurtenant drainage structures, evidence of positive <br />drainage. <br />~i/~,`o~~. ce ~~ sprr'n~ 5 D r 4C{'~ -S~'C°~~ ~ h.PS /10 7` <br />o6se~ut-a? ,4 ~~.~~ Gr4~ 6e~•, e~-c~~q~ /'~~/lam ~ z`~ <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction methodology. <br />Sob No. 28,170 <br />Page 1 of <br />