Laserfiche WebLink
.. ~ ii~~uititiii~i~uai <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural ReSOUrces <br />1313 Sherman SI., Room 215 <br />Denver, Colorado 80203 <br />Phone: (3031 866-3567 <br />FAY: 1303)832-8106 <br />DATE: May 7, 1998 <br />STATE OF COLORADO <br />TO: Jim Burnell <br />FROM: Dan Mathews ~ 9 <br />RE: McClane and Munger Canyon Mines, 1997 Annual Hydrology Report <br />Permits C-80-004 and C-81-020 <br />~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Lxhhead <br />Eaecuiive Director <br />Michael 0. Long <br />Division Director <br />I have completed a preliminary review of the referenced AHR, and I am forwazding a copy for <br />your review of conformance with PHC projections. <br />Munger Canyon Mine was, as usual, in temporary cessation for the entire yeaz. McClane was in <br />temporary cessation during the fourth quarter of 1996, but resumed active status during the first <br />quarter of 1997, and approximately 50,000 tons of coal was produced during the quarter. <br />Although the mine remained in active status for the remainder of the water yeaz, there was no <br />further coal production. <br />Sampling frequencies and analytical pazameters were incompliance with permit requirements, <br />with the exception that 1st quarter, 1997 East Salt Creek samples were not obtained because of <br />"extremely thick ice at the sample points." Also, summer storm event flows were sampled on <br />McClane and Munger Creek, but snowmelt flows were not sampled because the streams were dry <br />when checked. Due the relatively small, low elevation watersheds, snowmelt flow is a very <br />briefphenomenon in the creeks (I don't believe I've ever observed it). <br />I have attached documentation regarding the big storm events of August and September, which <br />was not included in the AHR. <br />Let me know if you need any further information for your review. <br />Thanks. <br />cc: Larry Routten <br />des\97ahr.mem <br />