Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 2 Mine <br />1999 Annual Hydrology Report <br />DH-58a Freeman Gulch • Drill Hole <br />Depth - 1000' Pipe 2.35' Above Ground <br />Field Parameters 07/41/1899 <br />W ater Elevation (Feet) ] J l z. 3 <br />Depth to Water (Feel) 1>3.p <br />pH (Standard Units) 9.3 <br />(Conductivity (umhos/cm) 513 <br />Temperature (C) ls.o <br />.ab Parameters <br />Vet Chemistry <br />Jkalinity as CaCO (mg/I) <br />Bicarbonate as CaCO (mg/ <br />Carbonate as CaCO (mg/I) <br />Hydroxide as CaCO (mgA) <br />(umhos/cm) <br />Nitrate/Nitrite as N, di: <br />Nitrite as N, dissolved <br />Nitrogen, ammonia (rr <br />pH (Lab Units) <br />Hardness (mgll) <br />3rous, ortho dissolved (mgll) <br />Filterable (TDS) Q180 C (rt <br />Absorption Ratio in Water <br />1B] <br />156 <br />31 <br />iz <br />sss <br />o.l <br />0.4 <br />0.3 <br />2.26 <br />9. <br />p.oa <br />l60 <br />13.4 <br />For tha Period Beginning 01101/1999 and Ending 14/3111999 <br />Ground Water <br />Top of Pipe Elevation - 7485.31' <br />Base Llne Min Max Avg <br />]112.3 ]J 12.J; ]112.3' <br />1]3.0 1]1.01 1]1.0 <br />9.3 9.l'I 9.l <br />613 513 1 513 <br />_16.0 L6.Ol 16.0, <br /> 18] 1B] 1B] I <br /> 156 156 156 <br /> J1 31 J1 <br /> <br /> lz 12 lz <br /> sss sss sss <br /> 0.12 0.121 o.lz <br /> 0.43 0.4J1 0.41 <br /> 0.31 0.J1 0.31 <br /> 2.z60 2.260 2.260 <br /> <br />I ~ <br /> I <br /> 0.009 0.009 0.0091 <br /> J60 360 360 <br /> 1].40 1].401 13.401 <br />I I loo I loo I loo <br />Arsenic, dissolved (mg/I) <br />Cadmium, dissolved (mg/I) <br />Calcium, dissolved (mg/I) <br />;Iron, dissolved (mg/p <br />Ilron, total recoverable (mg/l) <br />(Magnesium, dissolved (mg/I', <br />'Manganese, dissolved (mgA; <br />Manganese, fatal recoverabl <br />Mercury, dissolved (mg/I) <br />Selenium, dissolved (mg/I) <br />'Sodium, dissolved (mg/l) <br />Zinc, dissolved (mgll) <br />Reguired by current pertn~t <br />6.11 6.1; 6.1 <br />31.90 31.901 11.901 31 .40~ <br />0.5 O. S 0.6 0.5 <br />0.112 (- O.llal 0.112 0.112 <br />I <br />12].01 I lz].ol lz7.c 12].0 <br />0.09 0.09. 0.09 0.09 <br />baseline In/Ormation for Point DH~58a is denved Irom events beginning in O6/20/19051hrough 05/01/1997, a period of -t t 18 months <br />DH~5eb (Drill Hole ~ 3) is located along the road chat runs across the dtlge that separates Hubhard Creek Irom Tertor Creek near the point of access to the upper reaches of <br />Freeman Gulch. <br />Monitoring Point Table 98 <br />