My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15725
DRMS
>
Back File Migration
>
Report
>
REP15725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:45:11 PM
Creation date
11/27/2007 1:42:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
10/4/1985
Doc Name
1985 SEMI-ANNUAL SUBSIDENCE REPORT
From
COLO WESTMORELAND INC
To
MLRD
Permit Index Doc Type
SUBSIDENCE REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SUBSIDENCE MONITORIN6 ANALYSIS <br />EVALUATION Of EXISTING MONITORING <br />MIDELY SPACED GRID Page -3- <br />Because of the reduced coal market and reduced production, only Point No. 74 <br />needs to be installed and surveyed in 1985. CWI will mine in 1985 in the 8N-11N <br />panel below this monument. <br />Much of the reduction in subsidence monitoring is a direct result of reduced <br />production at Orchard Valley Mine. CWI believes that the closely spaced grid <br />will give information during this time and conditions will not change at the <br />widely spaced monuments to warrant taking additional data in these areas. On <br />the other hand, if production were to significantly increase and impact more <br />areas, CWI would immediately re-institute increased subsidence monitoring, as <br />required. <br />SUMMARY <br />CWI believes that subsidence monitoring is necessary for correct prediction of <br />subsidence-induced problems. We also believe it is unnecessary to continue to <br />gather data where information has already been obtained. Because of information <br />already gathered at some monuments and also reduced coal production, CWI feels <br />that suspension and/or delay of subsidence monitoring is prudent and justifi- <br />able. <br />
The URL can be used to link to this page
Your browser does not support the video tag.