Laserfiche WebLink
<br />B. Site Specific Reclamation Costs ($ Thousands) <br />The following are estimated costs of completing the <br />reclamation of each specific site from its present state of <br />reclamation. Costs are 1983 dollars. Acreages are projected <br />through 1984. Areas partially revegetated are itemized and <br />assigned appropriate costs to complete the reclamation from the <br />present state of progress. As in the past, "buffer" constitutes <br />lands reserved for future possible disturbance. <br />1. Mine Site (172 acres) <br />a) Dismantle, break even $ 0 <br />b) Reveg. 129 acres @ $2310/acre 298 <br />c) Buffer, 43 acres 0 <br />Total $ 298 <br />2. Vent Shaft (1 acre) <br />a) Secure shaft opening $ 10 <br />b) Fert. 1 acre, 1 application 0 <br />Total $ 10 <br />3. Portal Area (28 acres) <br />a) Dismantle, close portal $ 10 <br />b) Reveg. 3 acres @ $1045/acre 3 <br />c) Fert. 25 acres, 1 application 1 <br />Total $ 14 <br />4. Surface Railroad (121 acres) <br />a) Dismantle, break even $ 0 <br />b) Reveg. RR bed, 36 acres @ <br />$2310/acre 83 <br />c) Fert. slopes, 73 acres, <br />1 application 2 <br />d) Buffer, 12 acres $ 0 <br />Total $ 85 <br />5. Mill Yard and Access Roads (123 acres) <br />a) Dismantle, break even $ 0 <br />b) Reveg. Yard, 95 acres @ <br /> $1045/acre 99 <br />c) Buffer, 28 acres 0 <br /> Total $ 99 <br />6. East Branch Reservoir Shores (100 acres) <br />a) Dismantle, break even $ 0 <br />b) Reveg. 4 acres @ $1045/acre 4 <br />c) Fert. shores, 41 acres, <br /> 1 application 1 <br />d) Buffer, 55 acres 0 <br /> Total $ 5 <br />