Laserfiche WebLink
<~ <br />Robillar~d <br />8 ASSOCIATE51 INC. <br />CONSULTING ENGINEERS <br />Conauiting Engineers <br />Lantl Surveyors <br />Construction Managers <br />Planners <br />P.O. Box 2117 <br />finowoank Builtling <br />Dillon, Colorado 60435 <br />Buaineaa: (3031 466261 <br />Denver Direct. 623-0126 <br />June 6, 1984 <br />Ms. Kay James <br />Walden Coal Company <br />P. O. Box 229 <br />Boulder, CO 80302 <br />Subject: Reclamation Inspection <br />Walden Coal Company <br />Our Project No. 10018 - 200 <br />Dear Kay: <br />At your request, we conducted a thorough site inspection of the east <br />dump area and the southwest area of the horseshoe. This inspection <br />was made on June 5, 1984. <br />We have found that the final subgrade, as placed, conforms to the <br />design contours on the plate 20 map. The work remaining will be to <br />level the small areas around the field stakes. These stakes were <br />used to construct the final grade and to confirm the correct <br />elevation. <br />All observed construction procedures in placing the fill was <br />performed to acceptable standards. <br />Very truly yours, <br />ROBILLARD 8 ASS <br />~.--I I <br />Norman L. Ringh <br />Manager of Engi <br />NLR:sw <br />gb984 ~~~ ~ <br />T 'y....''I ~C <br />''~iiic n F C OL ~~~~' <br /> <br />