My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15484
DRMS
>
Back File Migration
>
Report
>
REP15484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:45:00 PM
Creation date
11/27/2007 1:39:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977439
IBM Index Class Name
Report
Doc Date
8/15/2003
Doc Name
Annual Fee/Report
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Notice of Intent to Continue Mining Operations RECEIVED <br />112c Construction Materials Annual Report <br />Permittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date: <br />Total: <br />Lafarge West, Inc. AUG ~ 5 ZOOS <br />M-1977-439 <br />Home Office Mine Division ~f Minerals and Gep~y <br />August 15, 2003 <br />$688.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 730.5 b. County where mine is located: Latimer <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? np <br />Does this mine operate MORE or LESS than 180 days per year? <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year:* <br />5. Total acres reclaimed for the report year:* <br />6. Total number of acres in topsoil replacement stage: <br />more <br />+/- .~io <br />0 <br />na <br />7. Total number of acres seeded: p <br />a. List species seeded and seeding rate for report year on back <br />e. For non-phased operations provide dates extraction ceased: na <br />a. Date reclamation began: na <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* none <br />10. Estimated total acres to be affected in the next report year:* +/_ s <br />a. Average thickness of topsoil replaced <br />11. COMMENTS: <br />* Please show the location of the acreage for items 4-6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTa If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through then a map unnecessary. However, this must be stated above. <br />Signature: Date 7/23/2003 <br />Please type or pri t current contact name, mailing address, and phone number below: <br />Contact Name: EricReckentine <br />company: Lafarge West, Inc. <br />Address: / _ /4~~ ~ ~Q~ <br />DenverCO.__YM So~~ <br />Phone: 303-657-4330 <br />FAx No : 303-6 ~j~-~(j7j~ <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.