My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15402
DRMS
>
Back File Migration
>
Report
>
REP15402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:57 PM
Creation date
11/27/2007 1:39:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Date
8/19/1984
Doc Name
BLUE RIBBON COAL CO BLUE RIBBON MINE SITE TECHNICAL REVISION PERMIT #C-047-81
From
BLUE RIBBON COAL CO
To
MLR
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7, Cover outslope of bench with overburden and available topsoil <br />• to a depth of four feet (approximately 16,000 cubic yards). Topsoil <br />presently stockpiled on the mine site will be used because the <br />restabilized bench will be in its final reclamation configuration. <br />8. Revegetation according to plan approved in the permit for <br />final reclamation. <br />The time table for this project is expected to be as follows: <br />Late August, 1984 - Rocky Mountain Geotechnical, Inc. report <br />to be submitted to the Division. <br />September, 1984 - Receive approval from the Division, begin <br />stabilization of the bench, and begin installation of drainage control. <br />October and November, 1984 - Fill and cover bench as far as <br />possible until winter weather stops work. Revegetation will start <br />if progress on the project allows. <br />• Spring and through August, 1985 - Finish fill and cover. <br />Fall, 1985 - Finish revegetation. <br />• -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.