Laserfiche WebLink
SANDCO INC ECEI VED <br /> PO BOX 4440 JUL 2 3 2001 <br /> DURANGO CO 81302 <br /> PLANT: 970-247-1303 FAX: 970-382-9220 nivii;ion of Minerals and Geology <br /> BOOKKEEPING: 970-247-9331 FAX: 970-247-$338 <br /> RED[-MIX-SAND&GRAVEL-EXCAVA ON <br /> DULY 7 2001 <br /> I , <br /> ANNUAL MINING PLAN <br /> II <br /> Sandco Inc currently operates a sand surface mining operation within the <br /> confines of the Animas River. This leased land is known as the Willow Ben I Pit or <br /> Sandco Inc. Willow Bend Pit comprises of approximately five point nine pem fitted acres. <br /> Mining in this pit is done annually, typically from November first to April fifti enth, the <br /> low water flows of the year. We extract the sand from sediment build up <br /> resulting from spring run off and other high water flow deposits. There are no vegetation <br /> or bank type disturbances associated with our annual mining operations wit 'n our <br /> permitted area. Any Questions please fill free to call 970-247-1303. Th you. <br /> David D Dillon <br /> i <br /> dN2 <br /> I <br />