My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15371
DRMS
>
Back File Migration
>
Report
>
REP15371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:56 PM
Creation date
11/27/2007 1:38:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991035
IBM Index Class Name
Report
Doc Date
6/30/1994
Doc Name
TECHNICAL STATUS REPORT CDOH ROCKY FLATS SOIL PLUTONIUM SURVEY FROM 1970 TO 1991
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r <br />1 <br />t <br /> <br />t <br />J <br />1 <br />1 <br />Addendum to CDH Soil Plutonium23~'240 Surveys 1970-1991, Love, June, 1994 <br />Historical Information <br />Backing up, a brief history and synopsis of the evidence is detailed in the following to support the <br />graphic results of the CDH soil survey. Prior reports and studies lend confirmation to varying <br />degrees to the conclusions drawn from the CDH soil survey. <br />1. Committee Evaluation of Plutonium Levels in Soil Within acrd Surrounding USAEC <br />/nsla!/anion at Rocky F/aJS, Colorado (Seed et al, 1971). The committee concluded: "additional <br />land should be purchased as proposed separately". (Seed et al, 1971) This is the purchase of the <br />present buffer zone which changed the boundaries of the Rocky Flats Plant. This action validates <br />the need I'or DOE to control the area east of the original plant boundary. <br />The Seed report presents the chronology of events surrounding the incident at the 903 Pad: <br />July, 1958 the initial storage of drums, <br />July, 1958 first leakage discovered, <br />January 1964 large scale deterioration of drums reported, <br />1 <br /> <br /> <br /> <br />1 <br /> <br />C~ <br /> <br /> <br />January, 1966 initiation of filtering and transfer of contaminated oils from leaking drums, <br />January, 1967 removal of drums started, <br />June, 1968 last drum shipped, <br />July 1968 radiation levels mapped from 2x 10' d/m/g( 9x10` pCi/gram) to over 3x10' <br />d/m/g (1.35x106 pCi/gram) reported, <br />September, 1968 preliminary proposal for containment cover. <br />July, 1969 first coat of fill material applied. <br />August 1969 fill work completed. <br />September 1969, overlay material, soil sterilant and asphalt prime coat completed. <br />November 1969 asphalt containment cover completed. (Seed et al, 1971) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.