Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />RAG EMPIRE CORPORATION WASTE PILE INSPECTI01'1 FORM <br />PILE l.D. NO. 121 I-CO-09-01370-O1 (SURFACE WASTE PILE) <br />PILE I.D. NO. 1211-CO-09-01370-02 (OLD NO. 9 EXCAVATION) <br />DATE/TIME: ,_ ~//G/~ <br />INSPECTOR <br />INSPECTOR TITLE: ~~?:. // <br />Under the superv' ion of Gary Buchan, Colorado <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />/A. Stability of fill (quarterly inspection) <br />iv /~~ B. Critical construction periods: <br />1. Removal of all organic materiaUtopsoil <br />2. Placement of underdrainage system <br />_3. Installation of surface drainage system <br />_4. Placement and compaction of fill materials <br />5. Revegetation <br />NOTES: <br />J' / <br />RE <br /> <br />file:I:\EN\EN V IRONMENTAL\EMPIRE\IN SPREP\W ASTEPILEFORM.DOC <br />