Laserfiche WebLink
Battle Mountain Resources, Inc. <br />San Luis Project <br />DMG Permit No. M-88-112 <br />June 2002 Monthly Report <br />Page 3 <br />Table 1 (cont.)- June 2002 Piezometer/Well Depth to Water Measurements <br />Piezometer/Well Date De th to Water feet <br />BF-7R 6/28/02 41.63 <br />BF-8 6/28/02 DRY <br />BF-9 6/28/02 40.45 <br />BF-10 6/28/02 41.59 <br />BF-1 1 6/28/02 42.63 <br />BF-12 6/28/02 40.89 <br />BF-I3 6/28/02 35.37 <br />BF-14 6/28/02 34.90 <br />PC-2 6/28/02 39.81 <br />P6 6/27/02 DRY <br />p7 6/27/02 DRY <br />pg 6/27/02 96.92 (Total de th 97.51 <br />pg 6/27/02 71.84 Total de th 72.30 <br />p10 6/27/02 SZ~6 (Total de th 58.30 <br />p 11 6/27/02 41.23 Total de th 41.80) <br />p 12 6/27/02 41.54 (Total de th 41.71) <br />pl3 6/27/02 41.07 (Total de th 41.34) <br />p I q 6/27/02 DRY <br />P15 6/27/02 DRY <br />LS I 6/28/02 DRY <br />LD 1 6/28/02 URY <br />LS2 6/28/02 DRY <br />LD2 6/28/02 DRY <br />LS3 6/28/02 DRY <br />LD3 6/28/02 DRY <br />Should you have any questions or comments, please do not hesitate to contact either Mr. <br />Julio Madrid (719) 379-0799 or myself (303) 324-2630. <br />Sincerely, <br />Bill Lyl~ <br />Director of Env. Affairs <br />cc: Julio F. Madrid <br />File <br />