My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-07-05_REPORT - M1995095
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1995095
>
2001-07-05_REPORT - M1995095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2021 11:16:28 AM
Creation date
11/27/2007 1:37:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995095
IBM Index Class Name
Report
Doc Date
7/5/2001
Doc Name
Annual Fee/Report Notice
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> PERMIT NUMBER 1995-095 6/29/01 <br /> SIMLA HIGHWAY PIT <br /> ANNIVERSARY DATE: JULY 8,2001 ANNUAL REPORT <br /> PERMITTED ACREAGE=6 <br /> TOTAL ACRES AFFECTED DURING REPORT YEAR=0 <br /> ESTIMATED TOTAL ACREAGE TO BE AFFECTED IN THE NEXT REPORT YEAR=0.50 <br /> THIS OPERATION IS CURRENTLY DORMANT AT THIS TIME. THE NATIVE TOPSOIL HAS <br /> BEEN REMOVED TO A DEPTH OF 6",AND STOCKPILED ALONG THE WEST EDGE OF THE <br /> SITE. PRESENTLY,THERE IS GOOD VEGETATION COVERING THE ENTIRE STOCKPILE .A <br /> MINIMAL AMOUNT OF RECLAMATION HAS OCCURRED ALONG THE SOUTH SLOPE OF THE <br /> SITE AND SOME SPARSE VEGETATION HAS STARTED TAKING HOLD ON THE SOUTH END <br /> OF THE WEST SLOPE. OUR INTENDED ACTION FOR THIS SITE IS TO OBTAIN MATERIAL IN <br /> THE FOLLOWING MANNER. 1.) FRONT END LOADERS WILL FILL TRUCKS WITH MATERIAL, <br /> REMOVING THE SOIL TO THE FINISHED CONTOUR. 2.)AS THE FINAL CONTOURS ARE <br /> DEVELOPED, WE WILL BE LEFT WITH 3:1 SLOPES. AT THE END OF THE EXTRACTION <br /> PHASE, ALL AREAS WILL BE REGRADED AND TOPSOIL WILL BE REDISTRIBUTED IN EVEN <br /> LAYERS ACROSS THE ENTIRE SITE. ALL DISTURBED AREAS WIL BE RESEEDED AS PER <br /> RECOMMENDATIONS OF THE DOUBLE EL SCS.EL PASO COUNTY ANTICIPATES <br /> EXTRACTING MATERIAL FROM THIS SITE IN THE COMING YEAR. OUR INTENT WOULD BE <br /> TO REMOVE MATERIAL FROM THE NORTH SLOPE. RECLAMATION WILL CONTINUE ALONG <br /> THE WEST SLOPE FACE.ADDITIONAL BERMS AND EROSION REPAIR WILL BE DONE TO <br /> ADDRESS THE EROSION IN THE NE CORNER OF THE SITE. <br /> NO FINANCIAL WARRANTY WAS SET BY THE DMG. A PERFORMANCE WARRANTY WAS <br /> EXECUTED FOR THIS SITE ON JAN 18, 1996 AND HAS BEEN FILED WITH THIS DIVISION. <br /> EL PASO COUNTY DEPARTMENT OF TRANSPORTATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.