My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15123
DRMS
>
Back File Migration
>
Report
>
REP15123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:45 PM
Creation date
11/27/2007 1:36:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Report
Doc Date
9/8/1994
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110[2] ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii iiiiiiiiiiiuiii , ,~ . , <br />Notice of Intent to Continue Mining Operatighs <br />110(2) Annual Report t' <br />Permittee Name: Shalako International Inc ~ <br />Permit No: M-81-185 ~~ ~ <br />Operation Name: May Day Mine* <br />Anniversary Date: 09/05/94 <br />Total: $225.00 (Due on your Anniversary Date) <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MORE or LESS than 180 days per year? <br />Do you extract MORE or LESS than 70,000 tons of mineral or <br />overburden a year? <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br /> <br />„ ~ c ~: <br />~, ~.~ c.c.., ,. ~~..:.... <br />YES NO <br />MORE ESS <br />MORE LESS <br />YES NO <br />a. Backfilled: m d. Topsoil replaced: <br />b. Graded: ~ Average topsoil thickness <br />c. Seeded: replaced: C3 <br />List species seeded & seeding <br />rate for report year on back <br />Does this mine have a phased reclamation plan? <br />Permitted acreage: <br />Total acres affected during the report year:* <br />Total acres reclaimed for the report year:* <br />Total acres in various stages of reclamation:* <br />The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* O <br />8. Estimated total acres to be affected in the next report year:* <br />9 <br /> <br />~,-b • is <br />* Please show the location of the acreage for items <br />Indicate the phases of the reclamation which have been <br />your Ttimetable. <br />** NOTE: If there have not been any changes since the <br />previously submitted a map which correctly depicts the <br />through 6, then a new map is unnecessary. However, th <br />4 - 6 on your map**. <br />completed, correlated with <br />last annual report and you <br />current acreage in items 2 <br />is must be stated above. <br />Signatur Date: ~ c~eg1 ~d <br />Please type int current contact name, mailing address, and phone number below <br />Contact Name: •e)O~d~u !"-~•i'E~~U~tt/ - Phone: (30S> 2~*7 -34~ <br />Company: 3d~A<rl~ St1[i~tnFtLevrlv~.~'R2 <br />Address: 1;3 OX Zd3 m <br />°i,~e~~~ ea8r3o~ <br />.1Fgs~: <br />Federal Tax ID No. or Social Security No.: •;,;x' ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.