Laserfiche WebLink
• <br />Radium Hill Group Annual Report <br />Reclamation at the Radium Hill group occurred during the summer of 1999. Construction ~~ccurred at the <br />Rimrock A, Radium Hill No. 5, and the September Morn. Construction consisted of debri:> and structure <br />removal, recontouring mine spoils piles, closing of access roads, erosion protection, and seeding. <br />A storm event in Augus[ of 1999 caused damage to portions of the mine spoils pile at the ~'~eptember Morn. <br />The damage is scheduled to be repaired in 2000. <br />Attached aze three maps showing the approximate existing contours of the mine areas. Recountouring of <br />[he steep mine spoils pile at the September Morn Mine was extended to the drainage. This; portion of the <br />construction is not shown on the attached map. <br />