Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />Doc Date:12111/2001 <br />Nknem Felt{nkndo <br />m. ea ~n <br />Nud; Gkndo IIQI <br />~Iron~ m3/ee~nu <br />Fu 7W/164tIN <br />S~~ <br />March 12, 1,995 <br />:_f~~ - <br />Mr. Harry Ranney <br />Colorado Division of Minerals and Geology <br />1313 Sherman St. Room 215 <br />Denver, CO 80202 <br />RFf:FI~~Fn <br />MAR 7 8 1996 <br />Division of Minerals & ue,,~cay <br /> <br />I RE: 1995 Annual Reclamation Report, New Horizon Mine Permit Number C-81-008 <br />Dear Mr. Ranney: <br />Enclosed is the 1995 Annual Reclamation Report. It is inclusive for all activities <br />conducted during 1995. Doing the report was a very good exercise in the fact that we <br />caught a few over sights during the year. For instance, we missed taking Sub-soil <br />samples between Phase VI and Phase V topsoil campaigns. Therefore, Sub-soil <br />samples numbering SS-20A through SS-25B, (12 total), will be included in the 1996 <br />Report. Also, I reviewed the topsoil balance after Phase VI Topsoil Project was <br />complete and that information will follow in another T.R.. <br />If you have any questions, you know our number. <br />xc: Murari Shrestha, WFA <br />File <br />Sincerely, <br />Tod LeFevre <br />Mine Engineer <br />