My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15015
DRMS
>
Back File Migration
>
Report
>
REP15015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:41 PM
Creation date
11/27/2007 1:34:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Report
Doc Date
6/3/2005
Doc Name
2004 AHR Response Part 2
Annual Report Year
2004
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTI <br />Page No, 20 <br />Pemrit No.: 00.0034142 <br />MONITORING, SAMPLING, AND REPORTING REQUIREMENTS (Continued) <br />(iv) ]n the case of a municipal, state, or other public facility, by either a principal executive officer, ranking elected official, or <br />other duly authorized employee. <br />(b) All reports required by permits, and other information requested by the Division shall be signed by a person as described <br />above or by a duly authorized representative of that person. A person is a duly authorized representative only if: <br />(i) The authorization is made in writing by a person descnbed above; ~" <br /> <br />(ii) The authorization specifies either an individual or a position having responstbility for the- overall operation of the <br />regulated facility or activity Such as the position of plant manager, operator of a well or a well field, superintendent, <br />.... position of equivalent responstbility, or an individual or position having overall responsibility-for environmental matters <br />for the company: (A duly authorized representative may thus be either a named individual or any individual occupying a <br />namcd position); and, ~ ` <br />(iii) The written authorization is submitted to the Division. • - <br />6, e~atorv and Certification Requirements <br />If an authorization as descnbed in this section is no longer accwate because a different individual or position has responsibility for <br />the overall operation of the facility, a new authorization satisfying the 7equirements of this section must be submitted,to the <br />.Division prior to or together with any reports, information, or applications to be signed by an authorized representative. <br />The permittee, or the duly authorized representative shall make and sign the following certification on all such documents: <br />"I certify under penalty of law that this documnat and all attachments were prepared under my dueMion or supervision in <br />accordance with'.a system designed to asswe that qualified personnel properly gather and evaluate the information submitted. <br />Based on my inquiry of the person or persons who manage the system, or those persons duectly responsible for gathering the <br />information, the information submitted is to the best of my knowledge and -belief, true, accwate, and complete: I am aware that <br />there are significant penalties for submitting false information, including the posstbiliry of fine and imprisonment for knowing <br />violations." > <br />F .: <br />
The URL can be used to link to this page
Your browser does not support the video tag.