My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP14962
DRMS
>
Back File Migration
>
Report
>
REP14962
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:39 PM
Creation date
11/27/2007 1:33:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992038
IBM Index Class Name
Report
Doc Date
9/4/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br />Permittee Name: <br />Permit No. . <br />Operation Name: <br />Anniversary Date: <br />Total: <br />. III IIIIIIIIIII~I III <br />C.~,~ 117(p <br />~,~so <br />Notice of Intent to Continue Mining Operations RECEIVE p <br />112c Construction Materials Annual Report `LIB 7 <br />Sand Creek Farms Inc JLr O ~ ~~~/ <br />M-92-036 <br />Sand Creek Mine piVlSi0n 01 Min0ra16 & baolopp <br />September O1, 1997 <br />$5''JJ50.00 (Due on your Anniversary Date) L~/~' <br />1. a. Permitted acreage: %.S y~ b. County where mine is located: ~~~`4~ <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />9. Total acres affected during the report year:* ~~ <br />5. Total acres reclaimed for the report year:* <br />6. Total number of acres in topsoil replacement stage: <br />a. Average Ehickness bt topsoil replaced: d <br />7. Total number of acres seeded: Q <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: (% <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* 8 <br />10. Estimated total acres to be affe~ct~ed /i}-n~the next report year:* ,~AM~ <br />11. COMMENTS: l~ ~~ Q,s ~.L~-vtef ~~ <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is/unnnecessary. However, this must be stated above. <br />Signature: (~2.e~< Y~ Date: ` ~^ 7 C <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: ~ hC~ ~~~~~ ~~J Phone: (.303 ) c 22 9`/Q( <br />C /~ FAX NO: (~03 ) ~~~- 9S S I <br />Company: ..n/ll~h ~ l_. LI~ <br />Address: b~,/ Y~y <br />h3 4k~1'~a SS ° ~~3 <br />Federal Tax ID No. or Social Security No.: 7C 7' ~~ - L ~~ <br />~@ <br />
The URL can be used to link to this page
Your browser does not support the video tag.