My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP14910
DRMS
>
Back File Migration
>
Report
>
REP14910
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:36 PM
Creation date
11/27/2007 1:32:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
4/21/2003
Doc Name
Submittal of Geotechnical Reports from 1995
From
Natural Soda Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page A-2 <br />APPENDIX A <br />CALCULATION OF THE HEIGHT OF THE CAVING ZONE <br /> <br />Depth Idealized Stratigraphic Cross Section of Boies Bed <br />Nahcolite Content <br />10' L-SE 80% <br />20' L-SB and L-SC 50% <br />22' L-SA (Upper Boies Bed) 80% <br />5' Oil Shale Mazker Bed 50% <br />3' Lower Boies Bed 80% <br />The equivalent thickness of nahcolite: <br />H= 10' x 80%+20' x 50%+22' x 80%+5' x 50%+3' x 80%=40.5'. <br />With 40% extraction of the nahcolite reserve, the extraction equivalent thickness is: <br />40.5' x 40% = 16.2' . <br />Scenario A. In the Environmental Impact Statement, a bulking factor of 1.3 was used. <br />i The following formula was used for predicting caving zone: <br />`-` (A-1) <br />H= k_~, <br />where His the height of the cavity zone, <br />h is the mining height, and <br />k is the bulking factor; <br />therefore, <br />H = is-Zt = 48.6 (A-2) <br />Scenario B. Also assuming a bulking factor of 1.1, the caving zone height is then <br />H = i=?~ = 162 (A-3) <br />Agapito Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.