My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP14853
DRMS
>
Back File Migration
>
Report
>
REP14853
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:35 PM
Creation date
11/27/2007 1:31:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
11/29/1999
Doc Name
FOIDEL CREEK MINE PN C-82-056 COAL WASTE PILE INSPECTION REPORTS FOR 1ST AND 2ND QTRS 1999
From
DMG
To
TWENTYMILE COAL CO
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Review Checklist <br />for Coal Waste Pile Inspection Report <br />Inspection period(s): 1" and 2"d quarters 1999 <br />Mine: Foidel Creek <br />CDMG permit no.: C-82-056 <br />Date review completed: 11/29/99 <br />CDMG reviewer: Tom Kaldenbach <br /> <br />Requirement Requirement <br />Requirement complied with ? Comment <br /> citation <br />(yes / no) <br />1. Inspector was CDMG regulations <br />qualified 4.10.2(1) and yes None <br /> 4.09.1(1l)(a) <br />2. Inspected during CDMG regulation <br />critical construction 4.10.2(1) and yes None <br />periods 4.09.1(11)(a) <br />3. Inspected at CDMG regulations <br />minimum quarterly 4.09.1(11)(a)and yes None <br />frequency 4.10.2(2)(a) <br />4. Timely submitted CDMG regulation None <br />report to DMG (within 4.09.1(11)(b) yg <br />two weeks of ins ection) <br />5. Conduct of <br />inspection: Observed and 4.10.2(2)(b) yes None <br />and tested to evaluate <br />hazardous conditions <br />6. Content of report: CDMG regulation <br />Described hazardous 4.09.1(11)(b) y~ None <br />conditions <br />7. Content of report: <br />Included photographs of CDMG regulation <br />~ <br />None <br />underdrain during and 4.09.1(1 I)(c) y <br />after construction <br />8. Promptly notified <br />DMG and other agencies <br />of potential hazardous-. 4.10.2(3) yes None <br />conditions found during <br />ins ection - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.