Laserfiche WebLink
' Manb 2004 Kerr Coat Company * 2003 Annua! Hydrohgy Report * CO Permit No. C-BO-006 ~ Page 77 <br />' 7.0 LOADOUT AREA SURFACE WATER <br />' Two loadout surface water sites (319 and 320) were monitored weekly from March through June, <br />then monthly through October. There was no recorded dischazge from Si[e 319. Limited dischazge <br />from Site 320 occurred during the month of May. The sedimentation pond associated with Site 320 <br />filled during spring runoff and retained some water through October. Site locations aze shown on <br />' Map 2, Loadout Area Monitoring Stations. <br />As of January 1999, the monitoring program for surface discharge points was reduced to monthly <br />' monitoring for a parameter list including only flow, temperature, pH, se[deable solids, and oil and <br />grease. Only the field measurements (flow, temperature and pH) are required for Site 320. This data <br />is contained in Appendix A, 2003 Field Data and is summarized in Table 6, 2003 Surface lY~ater Data - <br />LoadoutArea Surface Stations. Figure 6, Flom andpH -Station 320, shows the variation in flow over the <br />weekly measurements at station 320, along with the monthly pH readings. <br />Surface water sites 31 G, 317, and 318 were dropped from monitoring as of October 1999. No data <br />was collected from these sites during the 2003 water yeaz. <br />MIY?~ * t97S Aine Grave Rd., Ste. 709, * Steamboat Spnngr, Ca/orada 80477 * (970J 879-6260 <br />W.'\IY'l1l+~rraa~A51\.9v.W Nrb 14pM11pIVW) Hr/..6p Rgeri <br />3/I9/01N <br />