Laserfiche WebLink
'. -• <br /> <br />Reclamation Costs ($ thousands) <br />Henderson Mine <br />March 1987 <br />Page 4 <br />6. East Branch Reservoir Shores (100 acres) <br />a) Dismantle, break even $ 0 <br />b) Reveg. four acres at $1,045/acre 4 <br />c) Fert. shores, 41 acres, one <br /> application 1 <br />d) Buffer, 55 acres 0 <br /> Total $ 5 <br />7. Horseshoe Intake Shores (two acres) <br />a) Fert. two acres, one appl. $ 0 <br /> Total $ 0 <br />8. Ute Creek Reservoir Shores (12 acres) <br />a) Fert. 12 acres, one application $ 0 <br /> Total $ 0 <br />9. Tailing Deposition Area (2,446 acres) <br />a) Reveg. tailing, 782 acres at <br />$4,068/acre $3,181 <br />b) Flood control 200 <br />c) Reveg. pers. road, 94 acres at <br />$700/acre 66 <br />d) Perm. use, bypass canal/road, <br />40 acres 0 <br />e) Buffer, 1,530 acres 0 <br />Total $3,447 <br />10. Gravel Pit and Storage (54 acres) <br />a) Reveg. 35 acres at $1,045/acre $ 37 <br />b) Grading and site preparation 10 <br />c) Buffec, 19 acres 0 <br />Total $ 47 <br />11. RR Gravel Pit (five acres) <br />a) Grading and site preparation $ 1 <br />b) Reveg. five acres at $1,045/acre 5 <br /> Total $ 6 <br />12. Contractors' Camp and Storage (nine acres) <br />a) Fert. n ine acres, one appl. $ 0 <br /> Total $ 0 <br />13. Borrow Area (four acres) <br />a) Reveg. three acres at $1,045/acre $ 3 <br />b) Fert. o ne acre, one application 0 <br /> Total $ 3 <br />