My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP14702
DRMS
>
Back File Migration
>
Report
>
REP14702
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:29 PM
Creation date
11/27/2007 1:29:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Report
Doc Date
1/29/1993
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ~ III IIIIIIIIIIIII III ~ <br /> <br /> <br />~ . <br />~~ ., <br /> Notice of Intent to Continue Mining Operations <br /> 112 Annual ReDOrt <br /> ~ RN 2 9 1993 <br />Permittee Name: Cooley Gravel Company <br />Permit No: M-73-021 Uivi~ <br />Operation Name: Morrison Quarry MI NERALSa "~~~uVY <br />Anniversary Date: 12/31/92 <br />Total: $490.00 (Due on your Anniversary Date) <br />1. Has your min e been granted TEMPORARY CESSATION STATUS? YES NO <br />Does your mi ne operate MORE or LESS than 180 days per year? MORE LESS <br />2a. Financial Wa rranty: S 150,000.00 2b. Permitted acreage: 364 Acres <br />3. Do you have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:' 56.25 A c rea <br />5. Total acres reclaimed for the report year:' 3.25 Acres <br />6. Totai acres in various stages of reclamation:' <br />a. Backfilled: 3.2B d. Topsoil replaced: 26.25 <br />b. Graded: o Average topsoil thickness <br />c. Seeded: 26.25 replaced: 6 inches <br />List species seeded b seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report yyear;' 1000 pounds of Biosol was applied to 1.5 <br />acres, 500 pounds of Biosol was 'epplie <br />~ ~ 8. Estimated total acres to be affected in the next report year:' approximately 15.0 <br />acres in the central quarry area. <br />9. COMMENTS: <br />` Please show the location of the acreage for items <br />Indicate the phases of the reclamation which have been <br />your timetable. <br />•• NOTE: If there have not been any changes since the <br />previously submitted a map which correctly depicts the <br />through 6, then a new map is unnecessary. However, yo <br />4 - 6 on your map''. <br />completed, correlated with <br />last annual report and you <br />current acreage in items 2 <br />~ must state this fact above <br />Signature: ~i//,k%/7~~`~~ Date: 7~; /99~ <br />Please type or print current contact name, mailing address, and phone number below: <br />COntdCt Name: Robert B. Laird <br />COmpany: COOLEY GRAVEL COMPANY <br />- Address: P. o. sox 5485 <br />Denver, CO 80217 <br />Phone: ( 303 ) 989-0300 <br />federal Tax ID No. or Social Security No.: <br /> <br />\~~`~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.