Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />FIELD REPORT <br />Project: Refuse Pile <br />Location: Foidel Creek Mine <br />Client: Twentymile Coal Co <br />Project No.: 99-3983 <br />Report No.: 26 <br />Date: 5/22/06 <br />Time: 4.0 <br />Mileage: 44 <br />Engr.lTech: CR <br />Work Performed: <br />As requested, we visited the project site on this date and conducted compaction test No.'s 316 through 319 on the <br />material being placed in the Refuse Pile. <br />Twenty Mile Coal Company crews placed and compacted processed waste coal in Area 2'/. <br />We obtained a moisture content sample at each test location and one composite sample of the material being <br />tested and delivered them to our laboratory for moisture content determination and checkpoint Proctor <br />determination. The composite sample checkpoint Proctor matched a previous sample for this project. <br />Remarks: <br />The material tested generally met the project specifications for compaction. <br />Please refer to the attached sheet for results of today's testing. <br />