Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br /> <br />EASTSIDE COAL COMPANY, INC. <br />r.o. eax 161 <br />Silt, Colorado 81652 <br />(3Q3) 8762944 <br />February 24, 1994 <br />Barbara L. Pavlik, Reclamation Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Extension of Deadline for Annual Hydrology Report <br />Eastside Mine C-84-063 <br />Dear Ms. Pavlik: <br />RECEIVED <br />FEB 281984 <br />,:, . <br />c, rA/nky218. K `'rc,l`nv <br />Please extend the deadline for Eastside's Annual Hydrology Report to <br />March 30, 1994. This extension is needed because I have had a very <br />heavy work load and have been unable to organize the data into report <br />form. <br />Sincerely, <br />~ ~ <br />Linda Limbach <br />Eastside Coal Company, Inc. <br />/11 <br />