Laserfiche WebLink
' r' ~ h'•~•' ~r - - <br /> <br /> <br />February 1, 1983 <br />Valco, Inc. <br />P.O. Box 837 <br />Gunnison, Colorado <br />~ Ill 111lIlllllllllll <br />STATE pf CCL.OF aLO '~,.:rC -:^/ •~ <br />DEPARTMENT OF NATURAL RESCURGES <br />D. Monte Pascoe. Ezecun ve D~recwr <br />NIL~ED L:~.~1D RECI.A~I.~TION <br />423 Centennial Bwltlmg. 1313 Shermac Str~„ <br />Denver. Colo ratlc 8G2C3 Tei. ,303) 966-3 CE <br />David C. Shelton <br />Director <br />81230 <br />eW ~a~2 ~~~ <br />Re: File No. 78-287 J/ S~ 3~~0.% c'rz- <br />Based upon our records, the anniversary date of your r'ning operation permit is <br />February and annual fees for the year(sl 1983 , totalling <br />$ 350.00 are due on that date. Fees are based upon a schedule of <br />$350.00 if the operation is an open mining operation of ZO acres or more and <br />$275.00 for any other operation 10 acres cr mare. <br />Also, to bring the D-^is'on up to cats as to tie mining ens _-c'a.-a t: on on the <br />site, please submit a rerort and map (to a scale of .not Less than 100' to the <br />inch and not more than 650' to the :nc.h), i~dicat=ng die phases of the reclama- <br />tion plan which have been completed, correla`=d with `::e timetable. The report <br />and map shall contain the Folloo-drq ',.:~......_-on: <br />1) Location and nu.T,cer o` acres a~'ectec dur-n _.~: year, <br />2) Locations arc nu,:.ber of acres __clai.Ted fer t.~a` year, <br />3) The location and ru.:,bey o. acres _.. the •.~ar_ccs stages of reclana~'on <br />(backfilled, graded, topsoi= _epiaced, __.egetatar%, <br />4) The species of regatatior. :la~^ec, ~.= L^^:'-_-^s a.^d appro:u.-ate ..a_~s <br />of planting, <br />5) The type and approx_rnate quart:t_a o_° fertili=ers, organic mate r'al or <br />soil conditioners used and location of use, <br />6) An appraisal of the success of reclamation efforts snd in the event <br />of failure of any efforts, a short narrative on the sLSpect. or determined <br />causes of such failure, <br />7) Estimates of the location and number of acres to be affected in the <br />coming year, and <br />8) The effective date of the information provided above shall be no more <br />than 45 days prior to the anniversary date, <br /> <br /> <br />- ~hr~. t ..dti, ,. a ... <br />?~ss;~R--raft, ±. <br /> <br />I <br />r <br />_ • <br />